Hi,
The shelving/rack we using in EPA are metal frame and direct contact to ESD floor.
Without grounding wire on this shelving, our compliance verification measurement on point-to-ground is still well within <1 x 10E9 ohm requirement.
Is it still a MUST for us to put grounding wire? as we think this is redundant.
Thanks,
KK